View Poll Results: What version of Revit do you use?

Voters
72. You may not vote on this poll
  • Revit 2009

    6 8.33%
  • Revit 2010

    20 27.78%
  • Revit 2011

    46 63.89%
Page 1 of 2 12 LastLast
Results 1 to 10 of 18

Thread: What version of Revit does your office use?

  1. #1
    Member
    Join Date
    2010-01
    Posts
    3
    Login to Give a bone
    0

    Default What version of Revit does your office use?

    Hi,
    I am currently learning Revit 2010 and trying to figure out if I need to switch to 2011 right away.

    Let me know what version you are using. If you are upgrading in the very near future, say within two months vote for that version as opposed to your current.

    Thanks!

  2. #2
    I could stop if I wanted to rkitect's Avatar
    Join Date
    2006-01
    Posts
    449
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    Seeing as how everyone is valuing their ADesk subscriptions, I would say you want to upgrade as soon as you can. However, you're not having to relearn the software. Most of the UI changes are rather intuitive.

  3. #3
    I could stop if I wanted to michael.12445's Avatar
    Join Date
    2001-03
    Posts
    350
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    We generally have been keeping each project in the version in which it was started, unless it's a very simple project. We haven't started any new projects since 2011 came out, but once we do, we'll probably use it.

  4. #4
    I could stop if I wanted to TroyGates's Avatar
    Join Date
    2015-08
    Location
    Irvine, CA
    Posts
    281
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    Where's the option for all 3? We have projects in 2009, 2010, and 2011.

    And for people wondering if they should go to 2011 from 2010, my users are stating a night and day difference in performance and stability in 2011 vs 2010. So much so that we are probably going to upgrade all 2010 projects to 2011 very soon.

  5. #5
    All AUGI, all the time
    Join Date
    2006-03
    Location
    London, UK
    Posts
    810
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    we skipped 2010 because it was so awful, and are now considering 2011, but would need to upgrade some workstations first. so the majority of work is still done on 2009

  6. #6
    Member
    Join Date
    2006-12
    Posts
    17
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    For me I go ahead upgrade existing projects to the newest release unless I am working with other firms that need to continue working in an older one. IMO each release adds enough productivity enhancements, I see no reason to wait. 2011 is no exception I am finding small things everyday (that is in addition to the published changes) that just make my life as an architect easier and help me to produce better projects for my clients.

  7. #7
    I could stop if I wanted to jspartz's Avatar
    Join Date
    2015-12
    Posts
    361
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    Quote Originally Posted by TroyGates View Post
    Where's the option for all 3? We have projects in 2009, 2010, and 2011.

    And for people wondering if they should go to 2011 from 2010, my users are stating a night and day difference in performance and stability in 2011 vs 2010. So much so that we are probably going to upgrade all 2010 projects to 2011 very soon.
    Agreed, night and day, like Vista and Windows 7. Not many enjoyed Vista (2010), but everyone's jumping on Windows 7 (2011) like Vista's the Titanic

  8. #8
    Certifiable AUGI Addict twiceroadsfool's Avatar
    Join Date
    2006-01
    Location
    ---
    Posts
    4,516
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    Were getting everyone and every project in to 2011 as soon as circumstances allow. IT having time to install and consultants lagging behind are the only holdups at the moment.

  9. #9
    AUGI Addict
    Join Date
    2001-12
    Posts
    1,714
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    We generally try to upgrade all projects to the new version, usually right after the deadline following the new version release. Given the performance boost and fixes to the UI I don't see any reason not to upgrade as soon as possible. That and Electrical Engineers can probably be induced to bribe you with fine scotch if that is what it takes to get a project into 2011 ASAP.

    Gordon

  10. #10
    I could stop if I wanted to dfriesen's Avatar
    Join Date
    2003-05
    Location
    Vancouver, B.C.
    Posts
    470
    Login to Give a bone
    0

    Default Re: What version of Revit does your office use?

    Using 2009, but will be upgrading to 2011 shortly, now that the drunken leprechaun has sobered somewhat, and with the performance gains reported in 2011.

Page 1 of 2 12 LastLast

Similar Threads

  1. AB218-4: Autodesk® Revit®: A BIM Manager's Guide to Revit-alizing Your Office
    By Autodesk University in forum Architecture and Building Design
    Replies: 0
    Last Post: 2014-11-30, 01:17 PM
  2. Using Revit in an AEC Office
    By thomasel98 in forum Revit MEP - General
    Replies: 3
    Last Post: 2010-10-14, 01:26 PM
  3. Checking version of MS Office through AutoCAD
    By cadconcepts in forum AutoLISP
    Replies: 6
    Last Post: 2009-10-12, 05:14 PM
  4. Office to office workflow, creating a local file
    By sfraney in forum Revit - Worksharing/Worksets/Revit Server
    Replies: 4
    Last Post: 2009-01-21, 05:04 PM
  5. Replies: 3
    Last Post: 2005-09-26, 08:35 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •